Σάββατο 30 Οκτωβρίου 2021

Significant amendments to Carriage of Goods by Sea Act

 Introduction

In July 2021 the Carriage of Goods by Sea (Amendment) Act (2020) (the "Amendment Act") and its supplementary Carriage of Goods by Sea (Amendment of First Schedule) Order 2021 (the "Order") officially came into force.

The Amendment Act and the Order brought into effect the long-awaited changes to the Carriage of Goods by Sea Act 1950 (the "Principal Act"), which has been in force since 23 May 1950.

Reasoning

Prior to the amendments coming into force, the Principal Act regulated the carriage of goods by sea in Peninsular Malaysia by adopting the International Convention for the Unification of Certain Rules of Law Relating to Bills of Lading, which was incorporated as the First Schedule in the Principal Act.

The main reason for amending the Principal Act is to implement:

  • the "Visby Rules" – the Protocol to Amend the International Convention for the Unification of Certain Rules of Law Relating to Bills of Lading of 23 February 1968; and
  • the "The Hague-Visby Rules" – the Protocol (SDR Protocol) Amending the International Convention for the Unification of Certain Rules of Law Relating to Bills of Lading of 25 August 1924 (The Hague Rules), as amended by the Protocol of 23 February 1968 (Visby Rules).

The Amendment Act consists of four sections. This article focuses on the following changes:

  • The scope of documents relating to shipping transactions, which was limited to bills of lading, has been expanded to keep up with the rapid evolution of international maritime industry practices.
  • The First Schedule of the Principal Act has been amended in accordance with the The Hague-Visby Rules.

Amendments

Expanded scope of documents

Prior to the amendments, the Principal Act applied to bills of lading. This can be seen in section 4 of the Principal Act, which states as follows:

4. Statement as to application of Rules to be included in bills of lading

Every bill of lading, or similar document of title, issued in Malaysia which contains or is evidence of any contract to which the Rules apply shall contain an express statement that it is to have effect subject to the said Rules as applied by this Act.

However, in section 2 of the Amendment Act, the words "bills of lading" have been replaced with the words "sea carriage document(s)".

Similar changes have also been introduced to section 6 of the Principal Act. The original section 6 was restrictive and encapsulated only the weight of any bulk cargo inserted in the bill of lading. The original section 6 stated as follows:

Where under the custom of any trade the weight of any bulk cargo inserted in the bill of lading is a weight ascertained or accepted by a third party other than the carrier or the shipper and the fact that the weight is so ascertained or accepted is stated in the bill of lading, then, notwithstanding anything in the Rules, the bill of lading shall not be deemed to be prima facie evidence against the carrier of the receipt of goods of the weight so inserted in the bill of lading, and the accuracy thereof at the time of the shipment shall not be deemed to have been guaranteed by the shipper.

Subsequent to the alterations to section 3 of the Amendment Act, all references to "bill of lading" in section 6 have been updated to "sea carriage document".

Therefore, the amendments allow the Principal Act to recognize broader types of sea carriage documents commonly used by seafarers when conducting maritime trade. This effectively widens the substantive legal protection afforded to seafarers and maritime traders, thereby boosting international maritime traders' confidence to do business in Malaysia.

The Hague-Visby Rules

Section 4 of the Amendment Act introduces a new section 6A to the Principal Act, which empowers the minister of transport to amend the First Schedule to the Principal Act by way of an order published in the Gazette.

Section 6A of the Principal Act came into force on 15 July 2021. Pursuant to the power under section 6A of the Principal Act, the minister of transport amended the existing First Schedule in the Principal Act, which was based on the The Hague Rules.

In general, the amendments have facilitated a universal substitution of references to "bill of lading" to "sea carriage document".

Amendments to article I – definitions

A new paragraph (aa) has been added to article I.

The addition has amended the Principal Act, providing a clearer definition of a "consignment note". Under paragraph (aa), a consignment note means a non-negotiable document that:

I. contains or evidences a contract of carriage by sea in connection with which no bill of lading or similar document of title has been issued;

II. clearly states that no liability for any loss of, damage to or delay of the goods will be accepted by the carrier of the goods; and

III. is clearly marked as being non-negotiable.

Paragraph (b) of the original article I was replaced with a new paragraph that defines a contract of carriage as that it:

applies only to contracts of carriage covered by a sea carriage document, in so far as such document relates to the carriage of goods by sea, including a negotiable sea carriage document issued under or pursuant to a charter-party from the moment at which the document regulates the relations between its holder and the carrier concerned.

To add clarity to the amended Principal Act, a new paragraph (ba) has also been inserted to provide a definition of "data message". Under the new paragraph:

"data message" means information generated, stored or communicated by electronic, optical or analogous means, including electronic data interchange, electronic mail, telegram, telex or telecopy, even if the information is never reproduced in printed form.

In conjunction with the expansion of the scope of documents recognised and governed under the amended Principal Act, new paragraphs – (f) and (g) – are now in service to provide definitions for "negotiable sea carriage document" and "sea carriage document". Under paragraphs (f) and (g), these terms are now defined as follows:

(f) "negotiable sea carriage document" means-

(i) a bill of lading other than a bill of lading that, by law, is not negotiable; or

(ii) a negotiable document of title that is similar to a negotiable bill of lading and that contains or evidences a contract of carriage of goods by sea;

(g) "sea carriage document" means-

(i) a bill of lading;

(ii) a negotiable document of title that is similar to a bill of lading and that contains or evidences a contract of carriage of goods by sea;

(iii) a bill of lading that, by law, is not negotiable; or

(iv) a non-negotiable document including a consignment note and a document of the kind known as a sea waybill or the kind known as a ship's delivery order which either contains or evidences a contract of carriage of goods by sea . . .

New article IA – sea carriage documents

By virtue of the Order, further and more comprehensive details have been given under the new article IA on the applicability of sea carriage documents.

The new article begins by affording equal legal protection to a digital sea carriage document as that of a printed sea carriage document. Reading this amendment together with the newly added paragraph (ba) under article I, it means that a sea carriage document does not need to be printed to be afforded legal protection under the amended Principal Act. Sea carriage documents presented in soft copies also enjoy legal protection.

Paragraph 2 of the new article IA provides for the time and manner in which a sea carriage document should be issued and transferred. Paragraph 2 provides that:

a. a sea carriage document is issued when a data message is generated in a way that constitutes issue of such a document within the system being used by the parties to the relevant contract of carriage; and

b. a sea carriage document is transferred when a data message is generated in a way that constitutes transfer of the sea carriage document within the system being used by the parties to the relevant contract of carriage.

Amendments to article II – risks

The amendment also introduced additions to article II. In particular, the following paragraphs have been added to afford greater protection to carriers for goods carried on or above deck:

2. For the purpose of paragraph 1, "goods includes goods, except live animals, carried on or above deck".

3. Where the shipper has specific stowage requirements for goods carried on or above deck, then, for paragraph 1 to apply, the shipper shall tell the carrier in writing of those requirements at or before the time of booking the cargo.

4. Notwithstanding Article IVbis, if a carrier carries goods on or above deck contrary to an express agreement with the shipper of the goods made at or before the time of booking the cargo, then, for any loss or damage to the goods that results solely from the goods being carried on or above deck, the carrier is not entitled-

(a) to any exception or exemption under these Rules; or

(b) to any limit provided by these Rules to its liability for the loss or damage.

Amendments to article III – responsibilities and liabilities

The Order has not changed the substance of article III but it has amended the original article 4 to afford a negotiable sea carriage document (which has substituted the bill of lading) greater evidential value in the event of a dispute.

Under the original provision, it was declared that a bill of lading was prima facie evidence of the receipt of the goods by the carrier, as described in accordance with:

  • paragraph 3(a) (marks necessary for the identification of the goods);
  • paragraph 3(b) (number of packages, price or the quantity or weight of the goods); and
  • paragraph 3(c) (apparent order and condition of the goods).

However, the Order has introduced amendments that have increased the evidential value of a negotiable sea carriage document. Now, not only is a negotiable sea carriage document prima facie evidence of receipt of the goods by the carrier, but also any proof to the contrary is inadmissible if a negotiable sea carriage document has been transferred to a third party acting in good faith.

The wording of paragraph 6 of the Principal Act has been amended. The former wording was as follows:

In the case of any actual or apprehended loss or damage the carrier and the receiver shall give all reasonable facilities to each other for inspecting and tallying the goods.

The new wording is as follows:

Subject to paragraph 6bis, the carrier and the ship shall in any event be discharged from all liability whatsoever in respect of the goods, unless suit is brought within one year of their delivery or of the date when they should have been delivered. This period may, however, be extended if the parties so agree after the cause of action has arisen.

Further, a new paragraph, 6bis, has been inserted to allow for an action for indemnity against a third party. Paragraph 6bis reads as follows:

6bis. An action for indemnity against a third person may be brought even after the expiration of the year provided for in the preceding paragraph if brought within the time allowed by the law of the court seized of the case. However, the time allowed shall be not less than three months, commencing from the day when the person bringing such action for indemnity has settled the claim or has been served with process in the action against himself.

Amendments to article IV – rights and immunities

Prior to the amendments, paragraph 5 of article IV limited the liability of a shipper or carrier to any loss or damage of goods shipped, unless the value of the goods had been declared.

The Order overhauled this approach and inserted a more commercially practical approach by calculating the amount for which the shipper or carrier will be liable if the goods have been damaged or lost and the value was not declared in the sea carriage document.

The Order has removed the cap of £100 per package or unit for damages. The new system calculates damages using:

  • the unit of account per package or unit; or
  • the unit of account per kilogram of gross weight of the goods that have been lost or damaged.

The higher value of the two options is used for the calculation. The total amount recoverable is calculated by referring to the value of the goods at the place and time that the goods were discharged, or should have been discharged, from the ship.

Article IVbis – defence and limit of liability

Article IVbis has been inserted as a specific provision under the First Schedule of the amended Principal Act, to govern the defences and limit the liability afforded to a carrier in a sea contract.

This article provides that the defences and limits of liability provided in the amended Principal Act, as a whole, will be applicable to "a servant or agent of the carrier", notwithstanding any potential actions resulting from the contract or in tort. However, article IVbis expressly prohibits the carrier or its servant and/or agent from relying on the defences or limits of liability stipulated under the amended Principal Act "if it is proved that the damage resulted from an act or omission of the servant or agent done with intent to cause damage or recklessly and with knowledge that damage would probably result".

Amendments to article VI – special condition

Article VI, as amended, still provides that notwithstanding the preceding articles, a carrier, master or agent of the carrier, and a shipper will be at liberty to enter into any agreement in any terms for the responsibility and liability of the carrier for any particular goods. This is also the case as regards the rights and immunities of the carrier in respect of such goods, or their obligation to achieve seaworthiness, "so far as this stipulation is not contrary to public policy, or the care or diligence of his servants or agents" in regard to the following actions conducted for carrying goods by sea:

  • loading;
  • handling;
  • storage;
  • carriage;
  • custody;
  • care; and
  • discharge.

The amendments to article VI introduced the following additional requirements:

a. the terms so agreed must be set out in a receipt or consignment note; and

b. the receipt or consignment note must be, and must be marked as being, non-negotiable; and

c. the receipt or note must state that no other sea carriage document has been, or will be, issued for the carriage.

Article VI, as amended, stipulates that any agreement entered into will have full legal effect. However, article VI does not apply to ordinary commercial shipments made in the ordinary course of trade; it applies only to other shipments where the character or condition of the property to be carried or the circumstances, terms and conditions under which the carriage is to be performed are such that would reasonably justify a special agreement.

Amendment to article IX

The amendment to article IX removed much of the original content. The original paragraph provided that "the monetary units mentioned in these Rules are to be taken to be gold value". However, it has been replaced with a paragraph that reads as follows:

These Rules shall not affect the provisions of any international Convention or national law governing liability for nuclear damage.

Comment

The Carriage of Goods by Sea Amendment Bill was introduced in Parliament in 2019 to amend the Carriage of Goods by Sea Act 1950, which contained procedures that were no longer in line with global practice in the maritime trade industry. The provisions of the The Hague Rules, as provided for in the First Schedule to the Carriage of Goods by Sea Act 1950, were inadequate to meet the current conditions and practices of carrying goods by sea.

The amendments to the Principal Act have occasioned changes that have been welcomed by stakeholders in the maritime trading industry.

 

Draft surveys – a critical tool to defend dry bulk cargo shortage claims

Draft surveys of bulk cargoes are a means of checking that the shipper's figures inserted in the bill of lading are correct. The receiver has paid for the quantity stated in the bill and that figure is prima facie or even conclusive evidence that the amount stated was loaded aboard. A draft survey may be the best evidence to refute claims for shortage, so we recommend that members routinely order draft surveys for dry bulk cargo.

It is generally accepted that performing a draft survey is not an exact science. Much depends on the weather conditions at the time, the swell, the accuracy of the draft marks and the care which is taken in carrying out the required calculations. Nevertheless, the accuracy of a draft survey which has been properly performed is generally regarded as being up to more or less 0.5 per cent of the final figure for dry bulk cargoes. Therefore, barring exceptional circumstances, such as a high swell during the survey, if the difference between the shore figure and the draft survey figure is greater than 0.5 per cent, it may well represent a physical gain or loss, rather than being simply a “paper” difference. The latter is of course just that – a difference on paper only. Such a difference is usually the result of the inaccuracies inherent in the different measurement methods which are used.

If the shore figure is less than the draft survey figure, any such difference is likely to be relatively unimportant. As we discuss below, the shipowner may be legally bound to deliver the weight or quantity stated in the bill of lading, regardless of the actual quantity received on board and available for discharge. If the vessel’s figure for cargo actually received on board (such figure being ascertained by a draft survey after loading) is greater than the bill of lading figure, the shipowner can be reasonably confident that the vessel has received on board at least the same weight or quantity of cargo as the weight or quantity stated in the bill of lading. As mentioned, this is the weight or quantity which he may well be contractually obliged to deliver. Therefore, barring an accident during the voyage resulting in the physical loss of cargo, the shipowner should be able to deliver at the port of discharge a weight or quantity approximately the same as that stated in the bill of lading, taking into account inevitable measurement variations and any loss inherent in the nature of the cargo, for example, weight loss due to drying of cargo during transit.

However, if the figure which the shippers wish to have inserted into the bill of lading is greater than the draft survey figure by more than 0.5 per cent the alarm bells should ring, both on board and in the shipowner’s office. The reason is that the quantity stated in the bill of lading will often be legally binding as against the shipowner, whether or not it is in itself accurate, and the shipowner may be prevented (the legal term is “estopped”) from arguing that the bill of lading figure was wrong and that the “excess” cargo was in fact never loaded. According to the Hague-Visby Rules the carrier is obliged, upon the demand of the shipper, to issue a bill of lading stating, inter alia, the quantity or the weight of the goods. Once issued, the bill of lading is, subject to any valid qualifying statements on the bill of lading itself, prima facie evidence of the quantity or weight recorded on the bill, but once negotiated, i.e. endorsed, by the shipper in favour of some other third party, it will in most cases amount to conclusive evidence in the hands of a third party acting in good faith. It follows that the carrier must inspect the goods diligently upon receiving them for shipment by conducting draft measurements for bulk cargoes. Following such inspection, any discrepancies or deficiencies should be appropriately recorded in the mate’s receipts and, subsequently, on the bills of lading. The proviso to Article III Rule 2 of the Hague and Hague-Visby Rules emphasizes that neither the carrier nor his agent nor the Master is obliged to issue a bill of lading recording a quantity of the goods which they had reasonable grounds for suspecting not accurately to reflect the quantity actually received or which they had no reasonable means of checking.

Bulk cargoes are commonly shipped under bills of lading which include wording such as “said to weigh” or “said to be” or “weight, measure, marks, numbers, quality, contents and value unknown”. In some jurisdictions such clauses, even if printed rather than typed on the face of the bill of lading, will mean that the bill of lading is not even prima facie evidence of the quantity stated to have been shipped. The burden of proof will therefore be on the cargo claimant to prove the quantity which he says was shipped. Such a clause will normally be upheld by the English courts. Unfortunately, the courts of many other countries will not recognize such a printed clause, on the ground that it merely forms part of the standard wording of that form of bill of lading and has not been added solely in connection with that particular shipment. It is therefore essential that such wording is typed or handwritten on the front of the bill of lading, whether or not the bill of lading form includes such printed words. However, it should be noted that some jurisdictions will not uphold such clauses at all, whether printed, typed or handwritten on the bill of lading. Therefore, clausing with “number, quantity and weight unknown” In circumstances where the difference is not normal or customary, it is insufficient to clause the bill of lading with the words “number, quantity and weight unknown”. If the Master has been able to determine the number, quantity or weight loaded, such clausing is clearly not true. Such clausing should, however, still be used in circumstances where the difference is normal or customary.

This brings us back to the importance of a draft survey, which is the only means those on board have of checking the shipper’s figure. The latter will usually be based on measurements carried out ashore. The Master will have had no means of checking these measurements. For various reasons, the shipper’s figure may not be accurate and if the draft survey gives a figure which is more than 0.5 per cent below the shipper’s figure, the Mate’s receipt and bill of lading should be claused to reflect the fact that there is probably a physical shortage of cargo. The clausing should clearly state the draft survey figures and should be as accurate as possible. In order to avoid the clausing charterers may offer a LOI holding the shipowner harmless if they agree not to do so. However, Members should be aware that such LOI may be unenforceable if a court or tribunal comes to the conclusion that they were given in order to try to persuade the shipowner to help the charterer or shipper to mislead an innocent third party, such as the buyer of the cargo, acting in good faith.

There are of course a number of practical problems which can arise. It may have been agreed that the bills of lading will be issued and signed by the local agent, who will often be acting on behalf of the charterer. The charterer may also be the shipper himself or connected to the shipper in one way or another. The shipper will almost certainly be invoicing the consignee on the basis of the weight or quantity stated in the bill of lading. Nevertheless, the bill of lading is likely to be signed and worded in such a way that it evidences a contract of carriage with the shipowner, not the charterer. In these circumstances, it can be difficult for a Master to ensure that the bill of lading is issued and signed in the form and wording he considers appropriate (i.e., in strict compliance with the Mate’s receipts). What he can do is:

(1) to make sure that his Letter of Authority to the agents specifically states that the bills of lading are to be signed strictly in accordance with the Mate’s receipts and

(2) to ensure that the Mate’s receipts are properly worded and where appropriate, contain the ship’s figures as calculated by draft survey.

It is important to stress that both steps outlined above should be taken. One by itself is not sufficient. These steps will not guarantee that the charterer or his agents do in fact issue bills of lading as authorized by the Master. Nor will they guarantee that the shipowner will have a defense to any claim for alleged cargo shortage which may be made by the consignee. However, they should mean that, if the shipowner incurs liability to the consignee because of the failure by the charterer or his agent to issue and/or sign a bill of lading on the authorized form, the shipowner has a good chance of succeeding with a claim for indemnity against the charterer under the charterparty.

A further point to be made is that, under the Association’s Rules, no cover is available for “liabilities, costs and expenses arising out of the issue of a bill of lading, waybill or other document evidencing the contract of carriage, known by the Member or the master to contain an incorrect description of the cargo or its quantity or its condition” (Rule 34 (1)(ix)). Therefore, cover would be denied under this Rule if the Member or the Master knew that the quantity shown in the bill of lading was wrong but nevertheless failed to clause the bill and incurred “liabilities, costs and expenses” as a result of such failure.

It is sometimes the case that the bulk cargo is divided in a number of relatively small parcels – say five separate parcels, each of 1,500 MT. Assuming there is no separation on board between these parcels, the only time at which a draft survey can usefully be carried out is on completion of loading the entire cargo at the specific port. The charterers and shippers will almost certainly want the vessel to leave as quickly as possible but provided the relevant tables have been checked beforehand, a draft survey should not take more than a couple of hours at the most. In the Association’s view, the investment in this short period of time, both after loading and before the start of discharge, is worthwhile.

The Association has handled a large number of claims for the alleged loss of agricultural products in particular. Typically, these claims will be for the alleged loss of anywhere between 0.5 per cent and five per cent of the bill of lading figure. There is little doubt that virtually all such claims are “paper losses” and that the vessel delivered all the cargo received on board. Sometimes, however, such an argument is not sufficient to defeat a claim. This is where the draft survey reports show their value, as they serve as an independent record by the vessel of the quantity received on board at the port(s) of loading and the quantity on board before the start of discharge. If the hatch covers have been sealed after loading and these seals are intact before the start of discharge (and the fact that they are intact is witnessed by the consignee), this is an additional indication that no loss of cargo could possibly have occurred during the voyage.

Hard, factual evidence is a vital factor in the defense of any claim and the shortage claims we have mentioned are no exception. The absence of draft survey reports will mean that there is no independent evidence which the shipowner can use to try to show that the weight or quantity stated in the bill of lading was wrong and that, by comparing the figures shown in the draft survey reports, the vessel delivered approximately the same weight or quantity as was received on board at the port(s) of loading. Without this evidence, the shipowner can sometimes do little more than argue that the weight or quantity stated in the bill of lading is not even prima facie evidence of the weight or quantity actually shipped on board, but as we have said, this argument depends heavily on the wording of the bill of lading and a complete rejection of the claim is often difficult to achieve.

As mentioned above, the carrier’s obligation to state accurate figures on the face of the bill of lading derives from the provisions of the Hague and Hague-Visby Rules. Shipowners are therefore recommended to arrange for draft surveys, both after loading and before discharge, whenever a bulk cargo is being carried. The Association will arrange for such surveys through its local correspondents. The cost involved is normally for the Member’s account in the first instance, but if the report is used in defense of a claim, the cost may be recovered from the Association. Furthermore, if the report results in a claim being rejected and withdrawn, this will reflect favorably on the Member’s loss record.

Σάββατο 25 Σεπτεμβρίου 2021

Why the Golden Ray capsized

The National Transportation Safety Board has determined that an error in entering ballast water quantities into a stability program is the probable cause of the September 8, 2019 capsizing of the car carrier Golden Ray as it transited outbound through St. Simons Sound near Brunswick, Ga.

Less than 40 minutes after leaving port, the 656-foot-long vessel began to heel rapidly to port during a 68 degree turn to starboard. Despite attempts by the pilot and crew to counter the heel, the rate of turn to starboard increased, and the vessel reached a heel of 60 degrees to port in under a minute before it grounded outside of the channel.

The NTSB determined the probable cause of the capsizing was the chief officer’s error entering ballast quantities into the stability calculation program, which led to his incorrect determination of the vessel’s stability and resulted in the Golden Ray having an insufficient righting arm to counteract the forces developed during a turn while transiting outbound from the Port of Brunswick through St. Simons Sound.

Contributing to the accident was vessel operator G-Marine Service Co. Ltd.’s lack of effective procedures in its safety management system for verifying stability calculations.

The NTSB concluded the Golden Ray did not meet international stability standards at departure and possessed less stability than the chief officer calculated.

According to the NTSB, after the vessel capsized, open watertight doors allowed flooding into the vessel, which blocked the primary egress from the engine room, where four crewmembers were trapped. Two watertight doors had been left open for almost two hours before the accident. No one on the bridge ensured that the doors were closed before departing the port.

“The circumstances of this accident show that even when transiting in protected waters, watertight integrity is critical to the safety of the vessel and its crew,” the report said. “It is essential that the operator ensure that crews verify that all watertight doors are closed in accordance with safety management system procedures.”

As a result of its investigation, the NTSB issued two safety recommendations to G-Marine Service Co. Ltd.:

  • Revise its safety management system to establish procedures for verifying stability calculations and implement audit procedures to ensure their vessels meet stability requirements before leaving the port; and
  • Revise its safety management system audit process to verify crew adherence to the Arrival/Departure Checklist regarding the closure of watertight doors.

The public docket for the investigation contains more than 1,700 pages of factual information, including interview transcripts, photographs and other investigative materials and is available online .

All 23 crewmembers and one pilot on board were rescued, including four engineering crew who were trapped in the vessel for nearly 40 hours. Two crewmembers sustained serious injuries. The Golden Ray sustained significant damage due to fire, flooding and saltwater corrosion and was declared a total loss estimated at $62.5 million. An estimated $142 million worth of cargo, including more than 4,100 vehicles, was also lost.

Download the NTSB report at

https://www.ntsb.gov/investigations/AccidentReports/Reports/MAR2103.pdf


Κυριακή 5 Σεπτεμβρίου 2021

NTSB reports on expensive collision between two anchored ships

The National Transportation Safety Board has issued its report on a May 8, 2020, incident in which, at about 4.55 p.m. local time, the anchored general cargo vessel Nomadic Milde collided with the anchored bulk carrier Atlantic Venus on the Lower Mississippi River near New Orleans, La.

After the Nomadic Milde began to swing and drag its anchors in the current, it collided with the Atlantic Venus, which had been anchored directly behind it, and then struck a nearby chemical dock and grounded on the bank. No injuries were reported. The Nomadic Milde released an estimated 13 gallons of lube oil into the river. Damage to both vessels and the dock was estimated at $16.9 million.

ANALYSIS

In its analysis the NTSB says that the Nomadic Milde’s positions and headings suggested that the ship did not initially settle at its original anchor position.

“After the starboard anchor was let go, the ship moved about 730 feet away from the original starboard anchor drop position towards the right descending bank, a distance double the amount of chain that was set on the anchor, indicating that the starboard anchor likely dragged. The initial 6-minute anchor drag began within 10 minutes of when the pilot had informed the master that the anchoring was finished,” says the report. “The pilot departed the bridge while the vessel was still moving, although he said he had no concerns about the Nomadic Milde holding anchor. Had he noticed the initial drag of the Nomadic Milde, he may have remained with the vessel. Additionally, had the bridge team detected the initial drag before the pilot departed the vessel, or if the master had voiced any concern, they may have been able to request that the pilot remain with the ship to attend to the issue.

“The second officer and chief officer both stated that the ECDIS was their means to monitor the Nomadic Milde’s position at anchor. Monitoring a ship at anchor, especially in an area where the risks of nearby hazards and weather and current are present, requires a continuous state of vigilance and the use of all available means to determine whether a vessel is dragging or not. The second officer had set an ECDIS anchor watch alarm, which would have sounded had the vessel moved beyond the set radius. Neither the second officer nor chief officer recalled hearing the anchor alarm activate, and, given that the initial estimated distance from the stern of the Nomadic Milde to the bow of the Atlantic Venus was 490 feet, the anchor watch alarm radius setting of 590 feet was too large to provide for a timely alarm of the ship dragging. From 1551 to 1557, just before the change of the watch between the second officer and chief officer at 1602, the ship began to swing to starboard and dragged anchor, moving about 800 feet over about 6 minutes. Although the chief officer noticed that the vessel was not in the center of the anchor watch circle when he relieved the watch, he did not question if the ship had dragged or check whether the ship was remaining securely at anchor.

“The officers on anchor watch on the Nomadic Milde had adequate time and means to check whether the ship was remaining securely at anchor. At the watch relief, the chief officer did not cross-check the ship’s position after he noticed that the Nomadic Milde was not in the middle of the ECDIS anchor watch circle. Even after the initial alert by the Atlantic Venus to monitor their holding position, the chief officer did not take any follow-up action to address the concern, only communicating that their engines were ready on short notice. There was no evidence of either watch officer checking the ship’s position at frequent intervals or by means other than the ECDIS watch alarm to determine if the ship was secure at anchor or not. Although ECDIS is a useful tool in determining a ship’s position at anchor, the ship’s radars would have provided information for the crew to determine or crosscheck if the range to a vessel or object had decreased, or if the ship had moved while at anchor. There was sufficient evidence to alert the bridge team that the Nomadic Milde was not holding well, and, had this been detected, the master could have been alerted earlier, and, in turn, there would have been sufficient time to undertake necessary measures to address the problem.

“By the time the Nomadic Milde’s master was called to the bridge, he had lost about half the original distance between his vessel and the Atlantic Venus in which to react to and mitigate the situation. Knowing that a pilot was required to get under way in the Lower Mississippi River, he contacted New Orleans VTS and the ship’s agent to request a pilot but was informed he would have to wait hours. Seven minutes before the collision, the main engine was ready for use on the bridge—but VTS had told the Nomadic Milde not to heave anchor and to maneuver only with their engine until a pilot arrived. The master followed the instructions from VTS, keeping the anchors out. However, this severely limited the bridge team’s ability to control the vessel in the strong current, even while using the main engine up to full ahead, the bow thruster, and rudder.”

PROBABLE CAUSE

The National Transportation Safety Board determines that the probable cause of the collision between the Nomadic Milde and Atlantic Venus was the bridge team on the Nomadic Milde not effectively monitoring the vessel’s position and therefore not detecting that the vessel was dragging anchor and had moved from its original position during high-water conditions in proximity to other vessels. 

https://www.ntsb.gov/investigations/AccidentReports/Reports/MAB2115.pdf


Παρασκευή 23 Ιουλίου 2021

MAIB investigation report 9-2021: Stolt Groenland

Summary

On 28 September 2019, a cargo tank containing styrene monomer on board the Cayman Islands registered chemical tanker Stolt Groenland ruptured due to runaway polymerisation. The catastrophic rupture released a large quantity of vapour to the atmosphere, and it subsequently ignited. 



Fire-fighting efforts by the emergency services took over six hours and involved more than 700 personnel and 117 units of fire trucks, pumps and fire tugs.

 Safety Issues

·         the styrene monomer was affected by other heated cargo tanks

·         heat transfer from other cargoes was not fully appreciated

·         the styrene monomer temperature was not monitored




Recommendations

A recommendation (2021/122) has been made to Stolt Tankers B.V. aimed at ensuring the wider marine chemical sector benefits from the lessons learned from the Stolt Focus incident and research initiatives that were carried out as a result of this accident.

The Internantional Chamber of Shipping and INTERTANKO have been recommended (2021/118 and 2021/119) to promulgate our report to their members.

Recommendations (2021/117, 2021/120 and 2021/121) have also been made to the Cayman Island Shipping Registry , the Chemical Distribution Institute and Plastics Europe (Styrene Producers Association). These are intended to assist in ensuring that the guidance provided in certificates of inhibitor and styrene monomer handling guides is consistent and achievable given the limitations of equipment and testing facilities on board ships.

Full report at,

https://assets.publishing.service.gov.uk/media/60f93e2cd3bf7f044c51590b/2021-09-StoltGroenland-Report.pdf


Σάββατο 3 Ιουλίου 2021

Grounding of ro-ro freight ferry Arrow

At 0727 on 25 June 2020, the Isle of Man registered ro-ro freight ferry Arrow grounded in thick fog while entering Aberdeen Harbour. During its port approach, a pilot exemption certificate (PEC) holder provided by the vessel’s charterer was navigating by radar and steering the vessel.

The vessel encountered the thick fog a few minutes before it entered Aberdeen’s 70m wide Navigation Channel, and with limited support from the bridge team, the PEC holder became overloaded. Consequently, while attempting to correct a deviation to the north of the planned track, he over corrected to the south. The over-correction was not noticed by the bridge team in time to avoid the grounding.

After grounding, the vessel began to list significantly in the falling tide. After confirming no water ingress into the hull, with the assistance of a tug, the master used Arrow’s engines and bow thruster to refloat the vessel. There were no injuries or pollution but there was significant damage to the hull.

Safety issues

·   Arrow’s bridge team was not fully prepared for pilotage in restricted visibility. There was no effective shared mental model of the pilotage plan and the vessel’s progress along it.

·   The level of support provided to the PEC holder by the bridge team was poor.

·   Navigation techniques used did not provide Arrow’s bridge team with an accurate view of the available safe water in the Aberdeen approach channel.

·   Poor bridge ergonomics and limited electronic chart system capabilities meant that the PEC holder was navigating by use of radar alone.

 Full report may be read at

https://assets.publishing.service.gov.uk/media/60dc6b66e90e077176c20127/2021-08-Arrow-Report.pdf

https://assets.publishing.service.gov.uk/media/60dc6ba0d3bf7f7c389ab2c0/2021-08-Arrow-Annexes.pdf